Centreville Water Treatment Plant
Project Description
Design of mechanical & electrical services and control & telemetry systems for a water treatment facility building.
Electrical System consists of 277/480 volt distribution system with 150 KW diesel-driven, pad-mounted standby power generator, interface to radio telemetry system, and remote alarm notification system (including generator alarms). Generator was sized to operate the entire facility, and sub-base diesel fuel tank was sized for 24 hour operation.